What should be paid attention to in the construction process of crane rental?

2021-11-15

1. All personnel participating in the construction must be familiar with the lifting method and project content, carry out construction according to the requirements of the plan, and strictly implement the regulations and specifications.

2. During the construction process, the construction personnel must have a specific division of labor and clear responsibilities. During the whole hoisting process, it is necessary to earnestly observe the order on site, obey orders, and do not leave the work post without authorization.

3. During the hoisting process, there should be a unified command signal, and all personnel participating in the construction must be familiar with this signal, so that each operation position can coordinate actions.

.When hoisting, the entire site is deployed by the commander-in-chief. The sub-commander of each post should correctly implement the commander-in-chief's order, so as to transmit the signal quickly and accurately, and be responsible within the scope of their own duties.

During the whole construction process, the site should be cleaned up to remove obstacles to facilitate the operation.

6. During the construction, all personnel who participate in the climbing operation must pass the physical examination and pass the physical examination, and fasten the seat belt during operation and fasten it in a safe position. Tools should have safety ropes, and are not allowed to throw things down at will.

7. Construction workers must wear safety helmets, such as winter construction, the protective ears should be put down so that the hearing is not hindered.

8. The live welding wires and wires should be kept away from the steel wire rope. The distance between the live wires should be kept more than 2 meters, or a protective frame should be provided.

When the cable wind rope crosses the road, the height from the road surface shall not be less than 5 meters, so as not to hinder the passage of vehicles.

When the cable wind rope crosses the road, the height from the road surface shall not be less than 5 meters, so as not to hinder the passage of vehicles.

10. Before the hoisting construction, the local meteorological department should be informed of the weather conditions. Generally, it is not allowed to work in rainy and snowy days, in the open air or at night. If it must be carried out, anti-skid and sufficient lighting measures must be taken. It should be hoisted when it is greater than level 6, and large-scale equipment should not be hoisted when the wind force is greater than level 5.